![as built drawing caveat as built drawing caveat](https://methodstatement.store/wp-content/uploads/2020/08/as-buil-drawing-stamp.png)
Last updated March 2021įor projects before April 2021. Volume 3-06: Construction Specifications and Standard Drawingsįor projects from April 2021 and later. Volume 3-05: Drawing Requirements, Approvals, and Asset Acceptance/Transfer Volume 3-04: Pump Station and Forcemain Design Guidelines
#As built drawing caveat manual
Volume 3-02: Stormwater Management and Design Manual Volume 3-01: Development Planning Procedure and Framework
![as built drawing caveat as built drawing caveat](https://designassistpartners.com.au/wp-content/uploads/2014/09/Civil-As-Built-Drawing.jpg)
* Applied to all projects initiated after June 5, 2018. Volume 2: Complete Streets Design and Construction* (Roadways) (38MB) Often, the information is provided by the contractor in the form of red-line mark-ups of the design drawings. Google Sheets version available upon request, contact updated September 3, 2021 As-built documents are prepared based on information gath-ered during construction or fabrication by someone other than a practitioner or someone under their supervision. Volume 1: Table of Minimum Offsets (PDF version) Volume 1: Table of Minimum Offsets (Excel version) The Construction Specifications apply to new developments designed by consultants and constructed by contractors employed by private owners, as well as infrastructure development and rehabilitation projects designed and constructed by the City using its own forces, consultants or contractors.Indeed, consultants are encouraged to seek new and better solutions. The City will be receptive to change in those cases where variations will achieve a better technical or economical solution. The Design Chapters are not meant to be considered as rigid requirements. Fire safety in purpose-built flats, 2011, LGA Fire safety risk.The Contract Documents are not intended to be used for work where the owner is not the City.Volume 1: "General Provisions for Developers" outlines the responsibilities of developers during the construction phase of their projects and how they should interpret the specifications.The objective is to ensure that all infrastructure work in the City of Edmonton is constructed to a consistent standard. The standards apply to City of Edmonton contracts and private development projects.
#As built drawing caveat manuals
Each volume contains a design section, specifications and drawings as required, plus any other guidelines or manuals appropriate to that discipline. The standards are organized into 8 volumes by discipline. Originally published as a three volume hardcover edition in 1999 and amended in May 2001, the current edition is only available through the City's website.
![as built drawing caveat as built drawing caveat](https://uploads-ssl.webflow.com/58a7c63bb18e6794399bf3e3/5fc559c86abc598bbccbcd07_Asbuilt_Plan_Set-06_1.jpg)
The documents posted here are the current edition of the City of Edmonton's Design and Construction Standards.